S.No. | Item (2) | 2016-17 (4) | 2017-18 (4) | 2018-19 |
---|---|---|---|---|
1 | Fixed Charge(Rs./KVA of Billing Demand) | |||
11 KV Supply 33 KV Supply 132 KV Supply 220 KV / 400 KV Supply | Rs. 300.00 Rs. 470.00 Rs. 560.00 Rs. 590.00 | Rs. 330.00 Rs. 510.00 Rs. 610.00 Rs. 620.00 | Rs. 330.00 Rs. 510.00 Rs. 610.00 Rs. 620.00 |
|
2 | Energy Charges (Rs./Unit) 11 KV Supply 33 KV Supply 132 KV Supply 220 KV / 400 KV Supply | Upto 50% LF - In Excess of 50% LF Rs. 6.20 -------- Rs. 5.55 Rs. 6.10 -------- Rs. 5.10 Rs. 5.70 -------- Rs. 4.85 Rs. 5.45 -------- Rs. 4.65 | Upto 50% LF - In Excess of 50% LF Rs. 6.60 -------- Rs. 6.00 Rs. 6.50 -------- Rs. 5.50 Rs. 6.05 -------- Rs. 5.25 Rs. 5.65 -------- Rs. 5.00 | Upto 50% LF - In Excess of 50% LF Rs. 6.60 -------- Rs. 6.00 Rs. 6.50 -------- Rs. 5.50 Rs. 6.05 -------- Rs. 5.25 Rs. 5.65 -------- Rs. 5.00 |
3 | Power Factor Incentive Above --- Upto | |||
95% ------- 96% 96% ------- 97% 97% ------- 98% 98% ------- 99% 99% | 1% of EC 2% 3% 5% 7% | 1% of EC 2% 3% 5% 7% | ||
5 | Power Factor Penalty For each 1% Decrease in average monthly power factor | |||
Below 90% Below 85% Below 70% | 1% on EC for each 1% fall 5% + 2% for each 1% fall Disconnection | 1% on EC for each 1% fall 5% + 2% for each 1% fall Disconnection | 1% on EC for each 1% fall 5% + 2% for each 1% fall Disconnection |
|
5 | Load Factor Incentive | |||
LF < = 75% LF > = 75% | No incentive 0.10% for every 1% increase in LF above75% on EC for incremental consumption above 75% L.F. | No incentive | No incentive | |
6 | Annual Minimum Consumption | |||
11 KV / 33 KV Supply 132 KV / 220 KV Supply | 1200 Unit / KVA 1800 Unit / KVA | 1200 Unit / KVA 1800 Unit / KVA | 1200 Unit / KVA 1800 Unit / KVA |
|
7 | Billing Demand | Actual Maximum KVA or 90% of CD whichever is higher | Actual Maximum KVA or 90% of CD whichever is higher | Actual Maximum KVA or 90% of CD whichever is higher |
8 | Load factor calculation | (Monthly Cons. X 100)/ (No. of Hrs. in Billing Month X Demand X P.F) | (Monthly Cons. X 100)/ (No. of Hrs. in Billing Month X Demand(KVA) X P.F) | (Monthly Cons. X 100)/ (No. of Hrs. in Billing Month X Demand(KVA) X P.F) |
9 | Time of Day Surcharge / Rebate | |||
6 PM to 10 PM Surcharge 10 PM to 6 AM Rebate | Normal Rate of E.C. 20% of Normal E.C. | Normal Rate of E.C. 20% of Normal E.C. | Normal Rate of E.C. 20% of Normal E.C. |
|
10 | For Excess Demand: | |||
a) Energy Charges b) Fixed Charges | No Extra Charge (i) 1.30 times the charges for demand over 105% of CD when MD is upto 125% (ii)2.00 times the charges (when MD exceeds 125%)for demand recorded over and above 25% of CD in addition to (i) above. | No Extra Charge (i) 1.30 times the charges for demand over 115% of CD when MD is upto 130% (ii)2.00 times the charges (when MD exceeds 130%)for demand recorded over and above 30% of CD in addition to (i) above. | No Extra Charge (i) 1.30 times the charges for demand over 15% of CD when MD is upto 130% (ii)2.00 times the charges (when MD exceeds 130%)for demand recorded over and above 30% of CD in addition to (i) above. |